Smart Grid Comprehensive Construction Project in Yangzhou, Jiangsu Province

  • Site and Time

Yangzhou, Jiangsu   2012

  • Project Type

EPC

  • Brief Introduction
    • Pole-mounted switch: 104
    • Rack transformer: 335
    • Outdoor ring main unit: 50
    • High-voltage feeder pillar: 7;
    • Distribution SCADA function, comprehensive monitoring of primary switch devices;
    • Feeder automation of distribution line
    • Distributed generation integration
    • Outage management
    • Power quality monitoring etc.
  • Key Index
    • Outage restoration time: reduced from 41 mins to 10 mins
    • Reliability of power supply: improved from 99.984%to 99.994%
    • Voltage acceptability: improved from 99.907% to 99.943%